Wynn Al Marjan Island Resort & Casino
A USD 5.1 billion integrated resort. On Levels 40 to 42 I carry out the architectural finishing works: tiling, joinery, fire sealant, gypsum ceilings and gypsum board walls, working with the subcontractor trades on site.
I take part in the inspections of these works and follow each area through snagging, working to hand it over complete.
- Role
- Site Architect
- Contractor
- ALEC Engineering & Contracting
- Scope
- Levels 40 to 42, finishing and fit-out
- Period
- 2025 to present